(888) 394-4041
Get my answers
ADU Builder in Monte Sereno
Talk to the builder, not a salesperson
Leave your number — we call back in minutes, not days. No pressure, no pitch, just straight answers about what you can build.
Detached ADUs, attached ADUs and garage conversions. Designed, permitted and built by one team.
Mayer’s Construction & Remodeling is a family-owned, licensed contractor (CA License #1063024), in business since 2009. As an ADU builder in Monte Sereno, we build detached and attached ADUs and convert garages: our in-house design team draws the unit, we file with the City, and our own crew builds it.
How big can an ADU be in Monte Sereno?
850 square feet, or 1,000 with more than one bedroom, in the R-1-8 and R-1-20 zones. In the R-1-44 zone the City’s handout lists 800 square feet, or 1,200 with more than one bedroom.
A detached ADU can be up to 16 feet tall and sits at least 4 feet from the side and rear property lines. Under State law, converting an existing garage or part of the house is not held to these sizes.
Source: City of Monte Sereno, Accessory and Junior Accessory Dwelling Unit Requirements, revised March 2026. Checked November 2026.
Our work
Built by our crew
Swipe side to side.






City rules
Monte Sereno’s ADU rules, in plain words
From the City’s ADU handout, revised March 2026. ADUs are common here: the City issued 61 ADU building permits between 2018 and 2022, about 5 percent of its single-family homes.
Height and setbacks
A detached ADU can be up to 16 feet tall, with side and rear setbacks of at least 4 feet. A wall closer than 5 feet to a property line is built as one-hour fire-rated construction, or closer than 3 feet when the ADU has fire sprinklers. So at the 4-foot minimum, an ADU without sprinklers gets a fire-rated wall on that side.
Converting a garage
No setback is required when an existing garage or other accessory structure is converted, and the covered parking you remove does not have to be replaced.
Entry and exterior
The ADU has its own outside entry, which cannot be visible from the street, and no door connects it to the main house. At least two exterior materials and the roof pitch match the main house.
Power and heat
The ADU gets its own sub-panel of at least 100 amps, and the main house needs a 200-amp main panel. The ADU also has its own space heating and water heating, and a newly built one gets an automatic hot water recirculating system.
Coverage and sewer
An ADU of 800 square feet or less is not counted toward the lot’s structural and impervious coverage limits. The lot has to be connected to the sanitary sewer.
Renting it out
The City’s handout has no owner-occupancy requirement for ADUs. An ADU cannot be rented for a period shorter than 30 consecutive days. Junior ADUs have their own owner rule.
ADU size by zone
| Zone | Studio or one bedroom | More than one bedroom |
|---|---|---|
| R-1-8 | 850 sq ft | 1,000 sq ft |
| R-1-20 | 850 sq ft | 1,000 sq ft |
| R-1-44 | 800 sq ft | 1,200 sq ft |
City of Monte Sereno ADU and JADU Requirements, revised March 2026. The City’s R-1-44 standards sheet lists 1,200 square feet, and the State’s ADU Handbook says a local maximum has to allow at least 850 square feet (1,000 with more than one bedroom), so we confirm the R-1-44 one-bedroom figure with the Planning Department before design.
Sources: City of Monte Sereno and state documents: ADU and JADU Requirements (rev. 3/2026), Pre-Approved ADU Plans handout (rev. 9/2025), Development Standards, R-1-44 zone (8/2025), Housing Element (2024), California HCD ADU Handbook (March 2026), General Plan (adopted August 2026). Checked November 2026.
Our process
How your ADU gets built
Lot visit
We walk the lot with you and map the unit to your zone, the setbacks and what you want it for.
3D design
Our in-house design team draws the ADU in 3D, so you walk through it before permits are filed.
Permit
We file with the City online, with the soils report a new detached unit needs, and answer plan check.
Build
One crew builds it start to finish, with no subcontractors on your property. Any change is put in writing first.
No pitch. Just an honest estimate.
Leave your number — we call back in minutes, not days.
Rated 5.0 on Google & Houzz. 57 reviews: Google 25, Houzz 32.
Questions
Monte Sereno ADU questions
How big can an ADU be in Monte Sereno?
In the R-1-8 and R-1-20 zones, 850 square feet, or 1,000 square feet with more than one bedroom. In the R-1-44 zone, 800 square feet, or 1,200 square feet with more than one bedroom. The figures come from the City’s ADU handout, revised March 2026. For R-1-44, the City’s standards sheet lists 1,200 square feet and State law says a local maximum has to allow at least 850, so we confirm that figure with the Planning Department. Converting an existing garage or part of the house is not subject to these size limits.
How tall can an ADU be, and how close to the property line?
A detached ADU can be up to 16 feet tall, with side and rear setbacks of at least 4 feet. An ADU attached to the house follows the height limit of the zoning district, or 25 feet.
If I convert my garage to an ADU, do I have to replace the parking?
No. The City’s handout says that when existing covered parking is removed for an ADU, the parking does not have to be replaced. A converted garage also needs no setback.
Does an ADU need its own parking space?
Usually one space, covered or uncovered. The City’s handout requires none when the ADU is part of an application for a new house, is within half a mile of public transit, is in a historic district, or is within one block of a car share vehicle. The State’s ADU Handbook also exempts ADUs that are part of the existing house or an accessory structure, which covers conversions.
Does an ADU need fire sprinklers in Monte Sereno?
Not unless fire sprinklers are required for the main house, or the Santa Clara County Fire Marshal calls for them.
Does Monte Sereno have pre-approved ADU plans?
Yes, for new detached ADUs, with a gallery online. The pre-approved plans cover the building structure only. The foundation, grading and utility plans are still prepared for your lot. The City’s handout (September 2025) sets two limits: the plans are not approved for sites in the Wildland Urban Interface, where a significant portion of Monte Sereno is located, and they were reviewed under the 2022 codes and can be used only while those code versions apply. We check with the City before designing around one.
What is a junior ADU (JADU)?
A unit of 150 to 500 square feet inside the single-family home, with its own entrance and an efficiency kitchen. Its area counts toward the floor area allowed for the main house, and it needs no extra parking. The City’s handout says the owner lives in the main house or in the JADU and records a deed restriction. The State’s handbook requires owner occupancy only when the JADU shares its bathroom with the house, so we confirm which applies to your plan.
Can I rent out my ADU?
Yes, for 30 days or longer. The City’s handout says an ADU shall not be rented for a period of less than 30 consecutive days, and it sets no owner-occupancy requirement for ADUs. Junior ADUs have their own owner rule, in the question above.
How long does the City have to act on an ADU application?
State law gives a city 60 days to approve or deny a complete ADU application on a lot that already has a home, according to the California HCD ADU Handbook (March 2026).
Who builds ADUs in Monte Sereno?
Mayer’s Construction & Remodeling is a licensed contractor (CA License #1063024), family-owned since 2009 and rated 5.0 on Google and Houzz across 57 reviews. We design, permit and build detached ADUs, attached ADUs and garage conversions in Monte Sereno with our own crew. The first visit is free.
Where we work
Across Monte Sereno, and next door
The City’s General Plan names eight neighborhoods. We build ADUs in all eight.
More in Monte Sereno
ADU builders nearby
