Detached single-story backyard unit with a pergola, seen across the lawn at dusk Two-story home with a pool and a detached backyard unit at dusk Bathroom with a glass shower, a slate floor and an oak vanity Backyard with a fire pit and stone steps, a detached unit beyond the lawn
Monte Sereno, CA

ADU Builder in Monte Sereno

Talk to the builder, not a salesperson

Leave your number — we call back in minutes, not days. No pressure, no pitch, just straight answers about what you can build.

CA License #1063024 · (888) 394-4041

Detached ADUs, attached ADUs and garage conversions. Designed, permitted and built by one team.

Mayer’s Construction & Remodeling is a family-owned, licensed contractor (CA License #1063024), in business since 2009. As an ADU builder in Monte Sereno, we build detached and attached ADUs and convert garages: our in-house design team draws the unit, we file with the City, and our own crew builds it.

CA License #1063024 Family-owned since 2009 5.0 on Google & Houzz
Call (888) 394-4041

How big can an ADU be in Monte Sereno?

850 square feet, or 1,000 with more than one bedroom, in the R-1-8 and R-1-20 zones. In the R-1-44 zone the City’s handout lists 800 square feet, or 1,200 with more than one bedroom.

A detached ADU can be up to 16 feet tall and sits at least 4 feet from the side and rear property lines. Under State law, converting an existing garage or part of the house is not held to these sizes.

Source: City of Monte Sereno, Accessory and Junior Accessory Dwelling Unit Requirements, revised March 2026. Checked November 2026.

Our work

Built by our crew

Swipe side to side.

White detached backyard unit with a covered porch, lit at dusk
Detached backyard unit at dusk
Bathroom with a glass shower, a slate tile floor and an oak vanity
Glass shower, slate floor, oak vanity
Bathtub with a green tile surround under a skylight
Green tile tub surround, skylight
Stone trough sink below a window, between two arched mirrors on a wood wall
Stone sink, arched mirrors
Compact bathroom with a dark wood vanity, a wall-hung toilet and patterned tile
Dark wood vanity, wall-hung toilet
Outdoor shower with slate tile between two glass doors
Outdoor shower, slate tile

City rules

Monte Sereno’s ADU rules, in plain words

From the City’s ADU handout, revised March 2026. ADUs are common here: the City issued 61 ADU building permits between 2018 and 2022, about 5 percent of its single-family homes.

Height and setbacks

A detached ADU can be up to 16 feet tall, with side and rear setbacks of at least 4 feet. A wall closer than 5 feet to a property line is built as one-hour fire-rated construction, or closer than 3 feet when the ADU has fire sprinklers. So at the 4-foot minimum, an ADU without sprinklers gets a fire-rated wall on that side.

Converting a garage

No setback is required when an existing garage or other accessory structure is converted, and the covered parking you remove does not have to be replaced.

Entry and exterior

The ADU has its own outside entry, which cannot be visible from the street, and no door connects it to the main house. At least two exterior materials and the roof pitch match the main house.

Power and heat

The ADU gets its own sub-panel of at least 100 amps, and the main house needs a 200-amp main panel. The ADU also has its own space heating and water heating, and a newly built one gets an automatic hot water recirculating system.

Coverage and sewer

An ADU of 800 square feet or less is not counted toward the lot’s structural and impervious coverage limits. The lot has to be connected to the sanitary sewer.

Renting it out

The City’s handout has no owner-occupancy requirement for ADUs. An ADU cannot be rented for a period shorter than 30 consecutive days. Junior ADUs have their own owner rule.

ADU size by zone

ZoneStudio or one bedroomMore than one bedroom
R-1-8850 sq ft1,000 sq ft
R-1-20850 sq ft1,000 sq ft
R-1-44800 sq ft1,200 sq ft

City of Monte Sereno ADU and JADU Requirements, revised March 2026. The City’s R-1-44 standards sheet lists 1,200 square feet, and the State’s ADU Handbook says a local maximum has to allow at least 850 square feet (1,000 with more than one bedroom), so we confirm the R-1-44 one-bedroom figure with the Planning Department before design.

Sources: City of Monte Sereno and state documents: ADU and JADU Requirements (rev. 3/2026), Pre-Approved ADU Plans handout (rev. 9/2025), Development Standards, R-1-44 zone (8/2025), Housing Element (2024), California HCD ADU Handbook (March 2026), General Plan (adopted August 2026). Checked November 2026.

Our process

How your ADU gets built

1

Lot visit

We walk the lot with you and map the unit to your zone, the setbacks and what you want it for.

2

3D design

Our in-house design team draws the ADU in 3D, so you walk through it before permits are filed.

3

Permit

We file with the City online, with the soils report a new detached unit needs, and answer plan check.

4

Build

One crew builds it start to finish, with no subcontractors on your property. Any change is put in writing first.

No pitch. Just an honest estimate.

Leave your number — we call back in minutes, not days.

5.0

Rated 5.0 on Google & Houzz. 57 reviews: Google 25, Houzz 32.

Questions

Monte Sereno ADU questions

How big can an ADU be in Monte Sereno?

In the R-1-8 and R-1-20 zones, 850 square feet, or 1,000 square feet with more than one bedroom. In the R-1-44 zone, 800 square feet, or 1,200 square feet with more than one bedroom. The figures come from the City’s ADU handout, revised March 2026. For R-1-44, the City’s standards sheet lists 1,200 square feet and State law says a local maximum has to allow at least 850, so we confirm that figure with the Planning Department. Converting an existing garage or part of the house is not subject to these size limits.

How tall can an ADU be, and how close to the property line?

A detached ADU can be up to 16 feet tall, with side and rear setbacks of at least 4 feet. An ADU attached to the house follows the height limit of the zoning district, or 25 feet.

If I convert my garage to an ADU, do I have to replace the parking?

No. The City’s handout says that when existing covered parking is removed for an ADU, the parking does not have to be replaced. A converted garage also needs no setback.

Does an ADU need its own parking space?

Usually one space, covered or uncovered. The City’s handout requires none when the ADU is part of an application for a new house, is within half a mile of public transit, is in a historic district, or is within one block of a car share vehicle. The State’s ADU Handbook also exempts ADUs that are part of the existing house or an accessory structure, which covers conversions.

Does an ADU need fire sprinklers in Monte Sereno?

Not unless fire sprinklers are required for the main house, or the Santa Clara County Fire Marshal calls for them.

Does Monte Sereno have pre-approved ADU plans?

Yes, for new detached ADUs, with a gallery online. The pre-approved plans cover the building structure only. The foundation, grading and utility plans are still prepared for your lot. The City’s handout (September 2025) sets two limits: the plans are not approved for sites in the Wildland Urban Interface, where a significant portion of Monte Sereno is located, and they were reviewed under the 2022 codes and can be used only while those code versions apply. We check with the City before designing around one.

What is a junior ADU (JADU)?

A unit of 150 to 500 square feet inside the single-family home, with its own entrance and an efficiency kitchen. Its area counts toward the floor area allowed for the main house, and it needs no extra parking. The City’s handout says the owner lives in the main house or in the JADU and records a deed restriction. The State’s handbook requires owner occupancy only when the JADU shares its bathroom with the house, so we confirm which applies to your plan.

Can I rent out my ADU?

Yes, for 30 days or longer. The City’s handout says an ADU shall not be rented for a period of less than 30 consecutive days, and it sets no owner-occupancy requirement for ADUs. Junior ADUs have their own owner rule, in the question above.

How long does the City have to act on an ADU application?

State law gives a city 60 days to approve or deny a complete ADU application on a lot that already has a home, according to the California HCD ADU Handbook (March 2026).

Who builds ADUs in Monte Sereno?

Mayer’s Construction & Remodeling is a licensed contractor (CA License #1063024), family-owned since 2009 and rated 5.0 on Google and Houzz across 57 reviews. We design, permit and build detached ADUs, attached ADUs and garage conversions in Monte Sereno with our own crew. The first visit is free.

Tell us about your lot.

We call back in minutes, not days.

Scroll to Top