Our Blog · Kitchen Remodel · San Jose
Opening Your Kitchen to the Living Room: San Jose Permits
Taking out the wall between your kitchen and living room, or moving it, counts as a major remodel in San Jose, so you need a building permit and the application has to include plans. Whether that wall is load-bearing does not change that; it changes which of the City’s three application paths you can use, and usually whether an engineer is part of the drawings. Every City fact here was read from the City’s own pages on October 29, 2026.
By the numbers
3 paths
to apply: Over-the-Counter, Residential Express or Standard Plan Review
City of San José, Additions & Remodels
750 sq ft
the remodel ceiling for the two faster paths, one-story single-family homes only
City of San José, Additions & Remodels
1928
the year since which the City has required permits for building construction and improvements
City of San José Code Enforcement
2025 codes
the Building Codes in effect since January 1, 2026; plans drawn now are reviewed under them
City of San José, Building Permit Services
Cosmetic, minor or major: where a kitchen wall lands
Cosmetic
Kitchen example: Painting, cabinet resurfacing, new flooring or countertops.
What the City requires: No permit.
Minor remodel
Kitchen example: Sink, dishwasher and range replaced in place, with their new plumbing or wiring; no wall, window or framing changes.
What the City requires: A permit (the City says it may qualify for its online permit).
Major remodel
Kitchen example: Removing or moving the wall to the living room, moving the sink, changing a window opening.
What the City requires: Plans and a building permit (Additions & Remodels process).
Opening a kitchen to the living room changes the configuration of walls, so it is a major remodel every time, bearing wall or not. (Bathrooms get their own minor-versus-major article here soon.)
Is that wall load-bearing? Signs in a San Jose house
Nobody can tell from the paint. An engineer or an experienced framer checks what the wall holds up and whether it also braces the house against earthquakes. Have it checked before anyone cuts drywall. The signs that tip the odds:
Which way the ceiling joists run. Joists that cross the wall and rest on it make it a likely bearing wall; joists running alongside it make that less likely.
Where the wall sits. In many single-story San Jose ranch houses from the 1950s to the 1970s, the ceiling joists span from the outside walls to one bearing wall near the middle of the house, often right between kitchen and living room; treat that wall as bearing until the drawings prove otherwise.
What is under it, and above it. In a raised-floor house a bearing wall usually stands over a girder on piers in the crawlspace. A wall under an upstairs wall is usually bearing. A house with a trussed roof often has no interior bearing wall at all, which is good news for that wall; the attic shows which kind of roof you have.
Whether it braces the house. Interior walls can be part of the braced wall lines that resist earthquake loads. The City’s walk-in path only accepts framing that meets the prescriptive wall-framing and braced-wall rules of the California Residential Code, and its middle path turns away large openings that eliminate shear walls, so a wall that braces the house usually ends up in full plan review.
A bearing wall is not just removed: the plans show a beam sized for the load, posts at each end, and a path for that load to the ground, sometimes new footings. Under the state rule the City applies, any part of a project that departs from conventional wood framing is drawn or calculated by a licensed architect or registered engineer, with their stamp.
Four steps to a permitted open kitchen
- Plans. A remodel with structural changes needs project plans with the application; City staff check them against zoning, building and fire codes before issuing the permit. For a wall removal, the set shows the existing and proposed layout, the framing and, for a bearing or bracing wall, the beam design and calculations. Plans drawn now are reviewed under the 2025 Building Codes, in effect since January 1, 2026.
- Pick the path. The City offers three ways to apply.
- Over-the-Counter is the walk-in service; the permit is issued during your visit if the plans are accurate. It covers only a one-story single-family home with a remodel of 750 square feet or less, in prescriptive framing with no engineered calculations, and the City states that an OTC project cannot remove or structurally modify existing load-bearing walls, beams or roof framing. Some lots are out regardless (easements, certain zoning, flood, landslide and wildfire zones).
- Residential Express has the same size limits but accommodates engineered trusses and simple lateral loads; you upload the plans and the permit is issued in a virtual meeting, booked Tuesday through Thursday mornings up to two weeks ahead.
- Standard Plan Review takes everything else: apply at SJPermits.org, upload the set through SJePlans, answer the reviewer’s comments, and the permit is issued once the plans are approved.
So a non-bearing wall in a one-story house with conventional framing can go to the counter. A bearing wall rules the counter out; whether it fits Residential Express depends on the beam design the City reviews. Taking out a wall that braces the house usually means Standard Plan Review, and so does any job in a two-story house, since both faster paths take one-story homes only.
- The Permit Card. With the permit comes a Permit Card listing the required inspections; it stays on site for the inspector, and its record number (the RSN) is what you type in at SJPermits.org to book each one.
- Inspections. Book each one at SJPermits.org or call the Permit Center at 408-535-3555; have the plans and access ready, ladder included. Expect a framing inspection with the new beam and posts exposed, rough plumbing and electrical checks if the layout moves, then the final.
Walls opened without a permit
The City of San José has required permits for building construction and improvements since 1928, and it says change of ownership does not make unpermitted work legal. Code Enforcement handles unpermitted construction and can cite it, and state law requires you to disclose unpermitted work when you sell. If someone opened that wall before you bought the house, look up the permit history at SJPermits.org, have the framing checked, and get it permitted now.
How we handle it at Mayer’s
Mayer’s Construction & Remodeling is family-owned and based in San Jose, in business since 2009, California license #1063024.
Nathan runs each whole home remodel directly and holds the complete scope in one plan. Our in-house design team coordinates the trades from a single 3D model, and every material is sourced through one channel. Our licensed crew handles the structural planning, the permit and the build: we pull the permit from the City of San Jose Building Department and coordinate every inspection, and you don’t touch a form. One Mayer’s crew carries the job to the final walkthrough, no rotating subs, with daily updates from your project manager.
For a whole-home remodel, the size of the job and a second story also decide which path the City allows; our San Jose home remodel page explains that rule.
Open kitchens from our own jobs
These are the jobs our own site shows, in our own photos: kitchens open to the room beside them.
San Jose
The opening into the kitchen
Our project page: “Full Home Build and Remodel in San Jose, CA”. 37 photos.
San Jose
Kitchen and great room in one
The same project page, seen from the living side: a long island under a vaulted ceiling.
Palo Alto
Living room into the kitchen
Our project page: “Project Photos: A Palo Alto Whole-Home Remodel”. Six photos.
CA Lic #1063024
Our About page: “We hold California General Building License LIC #1063024.” Check it yourself on the state board’s page.
Look up 1063024 at the CSLBAsk us to see finished work near you; if you want to talk to a past client nearby, we can put you in touch.
Frequently asked questions
Yes. Changing the configuration of walls makes the job a major remodel in San Jose, so a permit with plans is required whether the wall carries load or not. Bearing decides the path, not the need.
Only when the wall is not load-bearing and the house meets the City’s other conditions: one story, single-family, a remodel of 750 square feet or less, prescriptive framing, and a lot outside the excluded zones.
The City recommends that the applicant be a licensed contractor, and it says whoever signs the building permit application is responsible and potentially liable for all activity under the permit. When we do the job, we pull the permit.
No. The City says change of ownership does not make unpermitted work legal, and Code Enforcement can cite unpermitted construction. Have the framing checked and permitted now.
Free in-home estimate
Thinking about opening the kitchen to the living room?
Call (888) 394-4041 for a free in-home visit. We come to your San Jose home, walk every room you want to change, and give you an honest estimate, no commitment; our in-house design team draws the options, and we handle the City of San Jose permit and inspections.
Mayer’s Construction & Remodeling · CA Lic #1063024
Mike Mayer
Project Manager, Mayer’s Construction & Remodeling · San Jose, CA · CA Lic #1063024 · Est. 2009
Sources (all read on October 29, 2026, Pacific time)
- City of San José, “Additions & Remodels” (single-family and duplex properties). Page shows “Updated: 04/14/2026”. Read 15:00. sanjoseca.gov
- City of San José, “Kitchen & Bathroom Minor Remodels”. Page shows “Updated: 04/13/2026”. Read 15:00. sanjoseca.gov
- City of San José, “Building Permit Services” (“The 2025 Building Codes became effective Jan. 1, 2026.”). No update date shown. Read 15:02. sanjoseca.gov
- City of San José, “Plans That Require an Architect or Engineer”. Page shows “Updated 03/02/2026”. Read 15:04. sanjoseca.gov
- City of San José, “When Is a Building Permit Required?”. Page shows “Updated 06/12/2025”. Read 15:06. sanjoseca.gov
- City of San José Code Enforcement, “Inspection Service Tiers”, section “Secure required permits to avoid violations” (permits required since 1928; change of ownership does not make unpermitted work legal). No update date shown. Read 15:08. sanjoseca.gov
- City of San José Code Enforcement, “Code Enforcement Process” (unpermitted construction; citations). No update date shown. Read 15:08. sanjoseca.gov
- City of San José Code Enforcement, “Legalizing Construction” (permit lookup by address at SJPermits.org). No update date shown. Read 15:06. sanjoseca.gov
- City of San José, SJPermits.org home page (“As of Jan. 1, 2026, the 2025 Building Codes are in effect.”) and “Schedule Inspection” page (RSN on the Permit Record card; Permit Center 408-535-3555). Read 14:57 to 14:59. sjpermits.org · Schedule Inspection
- Mayer’s Construction & Remodeling, Home Remodel San Jose page (linked above in “How we handle it”). Read 14:50. Source for every first-person statement about Nathan, the in-house design team, material sourcing, permits, inspections, the single crew and daily updates.
