AGOURA HILLS, CA · ADU CONSTRUCTION
ADUs in Agoura Hills
— Your City Pre-Approved the Plans
Agoura Hills runs its own pre-approved ADU program with reduced fees, and most homeowners have never heard of it. We put it to work for you: a design fitted to your lot, permits walked through the city's own Building & Safety counter on Ladyface Court, and one licensed family crew from first drawing to final inspection.
Got it — we’ll call you shortly.
A member of the Mayer’s team will reach out personally. If it’s urgent, call (888) 394-4041.




Verified where it counts
Licensed California general contractor, CA #1063024 (verify with the state). Family-owned since 2009.
Appliances & surfaces we build with

The ADU program your city already built for you
Agoura Hills is one of the only cities on this stretch of the 101 that runs its own Building & Safety counter, City Hall on Ladyface Court, not a county office two towns over. It also runs its own pre-approved ADU program: unit plans the city has already vetted, with reduced fees when your project uses them. In plain terms, that means fewer plan-check rounds, lower city-side fees, and a shorter line between deciding to build and holding a permit.
- Pre-approved city ADU plans
- 60-day state clock on complete apps
- Garage conversions welcome
Two honest notes from the counter
The city's plan catalog gets refreshed as the state building code changes, so we confirm the current set before you commit to one.
And you're never locked into a catalog plan. State law requires the city to process any complete ADU application ministerially, on a 60-day clock. Pre-approved is the head start, not the only road.

A detached unit in Old Agoura, a garage conversion in Morrison Ranch
No two Agoura lots ask for the same unit. In Old Agoura, the larger horse properties have room for a full detached ADU, and a neighborhood character the city expects new buildings to respect, which is exactly what an in-house design team is for. In Morrison Ranch, Fountainwood, Lake Lindero, and the other family tracts built in the '60s and '70s, the smart move is often a garage conversion or a compact backyard unit: a place for parents to live close without sharing a hallway, an adult kid staying near, or a long-term rental.
On the hillside streets off Kanan Road, slope and access decide the design before style does. We check setbacks, grade, and utility runs on the first visit, so the plan we draw is the plan the city stamps.
Everything handled, one crew
From the first sketch to the day you hand someone a key, this is the part that sits on us.
Design in-house
A catalog plan adapted to your lot, or a custom unit drawn from scratch by our own design team.
Engineering and submittal
Structural, site plan, and the full package filed and chased at the Ladyface Court counter.
Utilities planned early
Power, water, and sewer runs mapped before the build. No mid-build surprises.
Chapter 7A materials
Ignition-resistant materials wherever the hazard-zone map requires them, spec'd from day one.
Materials sourced by us
Our team orders and tracks what goes into the unit. Nothing is handed off to a broker.
One licensed crew
The same family crew start to finish, no subcontractors rotating through your yard.
Walkthroughs, inspections, keys
Scheduled walkthroughs, final inspections, and the keys in your hand.

A licensed builder, not an ADU brand
A lot of what looks like an ADU company online is a marketing brand. The lead gets sold, and the crew that turns up is whoever was free that month. Mayer's Construction is a licensed California general contractor. CA License #1063024, family-owned since 2009, 5.0-star rated across California. The people who draw your unit and the people who pour its foundation work for the same family.
That matters most at the counter. Somebody has to know which plan set the city is issuing right now, what a complete submittal looks like on Ladyface Court, and how to answer a correction without losing three weeks. The Bay Area's 5.0-star design-build team, now serving Agoura Hills.
How it works
Four steps, and you always know which one you're in.
- 01
Call or send the form
A real person calls you back within five minutes during business hours.
- 02
Free on-site estimate
We walk the lot, listen to what the unit is for, and tell you honestly whether a pre-approved plan fits or a custom design earns its keep.
- 03
Design and permits
Drawings in-house, the full submittal filed and chased at the Ladyface Court counter, corrections handled by us.
- 04
Build
One licensed crew start to finish: a written schedule, utility connections coordinated, final inspection through keys.
Questions Agoura Hills homeowners ask
What is the Agoura Hills pre-approved ADU program?
Do I have to use a pre-approved plan?
How long does ADU approval take in Agoura Hills?
Can I convert my garage into an ADU?
Can I rent it out, or is it just for family?
My lot is on a slope or in a fire-severity zone. Does that change the project?
Who deals with the city?
In our clients’ words
Rated 5.0 on Google
They worked hard to capture our vision, and if we ever ran into any issues, they worked with us to figure them out. We would happily use them again for another project.
High-quality materials, outstanding craftsmanship, and a very professional team. The entire project was well organized and completed on time, with great attention to detail.
Impeccable workmanship. Mike was a stickler for quality — insisting the tiles have mitred corners, even if I didn’t ask for it. Great communications, every step of the way.
Los Angeles County
More in Agoura Hills
ADU & Garage Conversion nearby
Let's plan your Agoura Hills ADU.
Start with the people who know the Ladyface Court counter.
