Remodeled kitchen with a stone waterfall island, navy cabinets and brass pendant lights Kitchen with light oak cabinets, a gray stone waterfall island and woven pendant lights Kitchen with walnut cabinets and a white quartz waterfall island White shaker kitchen with brass hardware and a farmhouse sink
Monte Sereno, CA

Kitchen Remodeling in Monte Sereno

Talk to the builder, not a salesperson

Leave your number — we call back in minutes, not days. No pressure, no pitch, just straight answers about what you can build.

CA License #1063024 · (888) 394-4041

Designed by our in-house team. Permitted with the City. Built by our own crew.

Mayer’s Construction & Remodeling is a family-owned, licensed contractor (CA License #1063024), in business since 2009. We remodel kitchens in Monte Sereno and handle the design, the materials, the City permit and the build, so you work with one team from the first visit to the final walkthrough.

CA License #1063024 Family-owned since 2009 5.0 on Google & Houzz
Call (888) 394-4041

Do you need a permit to remodel a kitchen in Monte Sereno?

Yes, if the cabinets are being replaced. New countertops, or refacing the cabinets you already have, do not need one.

Most full kitchen remodels replace the cabinets, so most need a permit, and we file it for you. If the job also moves walls, plumbing or wiring, check with the Building Department before assuming no permit is needed.

Source: City of Monte Sereno, Kitchen Remodel handout, revised March 2026. Checked November 2026.

Our work

Kitchens by our crew

Swipe side to side.

Kitchen with a stone waterfall island, navy cabinets and four brass pendant lights
Waterfall island, navy cabinets
Dark kitchen with a rust-veined marble waterfall island
Dark cabinets, veined marble island
Kitchen with light oak cabinets, a gray stone island and woven pendant lights
Light oak cabinets, gray stone island
Range wall with navy cabinets, a full-height stone backsplash and a pot filler
Range wall, full-height stone
Dark kitchen with copper pendant lights over a marble counter
Copper pendants, marble counter
Kitchen with walnut cabinets and a white quartz waterfall island
Walnut cabinets, white quartz island
White shaker kitchen with brass hardware and a farmhouse sink
White shaker cabinets, brass hardware

City rules

What the City checks in a Monte Sereno kitchen

These come from the City’s own handouts, not from a general Bay Area checklist. We design to them from the start.

Keeping a gas cooktop

The City asks for a dedicated 208 to 240-volt outlet of at least 50 amps within 3 feet of it, and a breaker at the main panel labeled “For Future Induction Cooktop”.

Countertop power

At least two 20-amp circuits feed the countertop outlets. Kitchen outlets are arc-fault protected and tamper resistant, and island outlets cannot sit below the countertop or on the cabinet face.

The electrical panel

The City notes the panel “may need to be upgraded, or a sub-panel added” to carry the new circuits. The largest group of Monte Sereno homes was built between 1940 and 1959, so we look at the panel on the first visit.

Homes built before 1994

When a building permit is issued, toilets, showerheads and faucets (the kitchen faucet included) that use more water than the current standard are replaced throughout the house. Homes built after January 1, 1994 are exempt. We put that in the plan up front.

Plan check

The first plan check takes about three weeks and a resubmittal about two. Applications that need plan check are filed online.

Inspections

A rough electrical inspection comes after the boxes are in and before any devices are connected. Structural, mechanical or plumbing changes get a rough inspection before insulation. Fire inspections are completed before the rough and the final. Inspections are generally available Monday and Wednesday mornings.

Sources: City of Monte Sereno and state documents: Kitchen Remodel handout (rev. 3/2026), Building Permit Submittal Requirements (rev. 9/2025), Building and Planning page, Inspection Information page, Housing Element (2024). Checked November 2026.

Our process

How your kitchen gets built

1

Visit

We come to the house, measure, and look at the panel, the plumbing and any wall you want to move.

2

3D design

Our in-house design team draws your kitchen in 3D, and we source the cabinets, stone and fixtures.

3

Permit

We file with the City of Monte Sereno online, answer plan check, and book each inspection.

4

Build

Our own crew builds it. 8 to 12 weeks from permit approval to final walkthrough. Any change is put in writing first.

No pitch. Just an honest estimate.

Leave your number — we call back in minutes, not days.

5.0

Rated 5.0 on Google & Houzz. 57 reviews: Google 25, Houzz 32.

Questions

Monte Sereno kitchen remodel questions

Do I need a permit to remodel my kitchen in Monte Sereno?

Yes, if the remodel replaces the kitchen cabinets. The City of Monte Sereno does not require a permit for countertop replacement or for refacing existing cabinets.

I am keeping my gas cooktop. What does the City require?

A dedicated 208 to 240-volt outlet of at least 50 amps within 3 feet of the cooktop, and a double-pole breaker at the main panel labeled “For Future Induction Cooktop”. The cooktop stays gas; the wiring is there for later.

How long does the City take to review kitchen plans?

About three weeks for the first plan check and about two weeks for a resubmittal, according to the City’s submittal requirements. Applications that need plan check are filed online.

Which inspections does a kitchen remodel get in Monte Sereno?

A rough electrical inspection after the electrical boxes are installed and before any devices are connected. Any other structural, mechanical or plumbing alterations get a rough inspection before insulation is installed. Fire inspections are completed before the rough inspection and before the final, and then comes the final inspection. Building inspections are generally available on Mondays and Wednesdays between 9 am and noon.

Will a kitchen permit make me replace toilets or showerheads in the rest of the house?

It can, in an older home. Toilets, showerheads and faucets that do not meet the water-efficiency standard are replaced throughout the house whenever a building permit is issued for an alteration. Homes built after January 1, 1994 are exempt.

How long does a kitchen remodel take?

8 to 12 weeks from permit approval to final walkthrough. The City’s plan check comes before that.

Who designs the kitchen and orders the materials?

Our in-house design team designs it with you in 3D before anything is built, and we source the cabinets, countertops and fixtures.

Who does kitchen remodeling in Monte Sereno?

Mayer’s Construction & Remodeling is a licensed contractor (CA License #1063024), family-owned since 2009 and rated 5.0 on Google and Houzz across 57 reviews. We design, permit and build kitchens in Monte Sereno with our own crew, and the first visit is free.

Tell us about your kitchen.

We call back in minutes, not days.

Scroll to Top