(888) 394-4041
Get my answers
Home Remodeling in Monte Sereno
Talk to the builder, not a salesperson
Leave your number — we call back in minutes, not days. No pressure, no pitch, just straight answers about what you can build.
Whole-home remodels and additions. One team for the design, the permits and the build.
Mayer’s Construction & Remodeling is a family-owned, licensed contractor (CA License #1063024), in business since 2009. We remodel and add on to homes in Monte Sereno: our in-house design team plans every room off one set of plans, we source the materials, file the permits and build it with our own crew.
When does a remodel count as new construction in Monte Sereno?
When less than half of the existing exterior walls, or less than half of the existing roof, stays in place. Then the City applies its rules for new buildings, including fire sprinklers.
The portion of a wall that gets a new or wider window or door no longer counts as existing, so the count is worth doing before the design is final.
Source: City of Monte Sereno, Policy for Application of Building Standards Code for Alterations/Additions and New Construction, revised January 2023. Checked November 2026.
Our work
One home, room by room
A whole-home remodel by our crew: the kitchen, the built-ins and the bathrooms. Swipe side to side.







City rules
What decides the path of a Monte Sereno remodel
Two City documents set the path: the remodel policy and the list of projects that need a Site Development Permit. We check both against your plans before the design is final.
The 50% rule
Keep at least half of the existing exterior walls and half of the existing roof area, and the project is an alteration. Below that, the City treats it as new construction: fire sprinklers, fire access, energy and green building standards, and the local reach codes.
How walls are counted
Walls are measured in linear feet. Portions with new or enlarged windows or doors do not count as existing. Neither do portions where the wall is raised, or exterior walls that end up inside the house behind an addition.
Stripping a wall
Removing the sheetrock and the exterior siding from an existing exterior wall counts as creating a new wall, unless it is needed for a seismic upgrade or waterproofing. The Building Department makes the final determination.
Additions that need a hearing
An addition of 500 square feet or more in the R-1-8 zone, or 750 or more in R-1-20 and R-1-44, needs a Site Development Permit before the building permit can be filed. So does any new second story on a one-story house.
Raising the roof
A roof change that lifts the overall roof height by more than 24 inches also needs the Site Development Permit. The City’s story pole handout calls for poles on second-story additions and on additions over 500 square feet, certified by a land surveyor two weeks before the public hearing.
Work hours
Monday to Friday 8 am to 8 pm and Saturday 9 am to 5 pm. No construction on Sundays or on the City’s 13 listed holidays. The rule covers contractors and homeowners alike.
Additions that need a Site Development Permit
| Zone | Any addition | Added to an existing second story |
|---|---|---|
| R-1-8 | 500 sq ft or more | 250 sq ft or more |
| R-1-20 | 750 sq ft or more | 500 sq ft or more |
| R-1-44 | 750 sq ft or more | 500 sq ft or more |
Also needed for a new second story on a one-story house and for a roof raised by more than 24 inches. The Site and Architectural Commission decides at a public hearing.
Sources: City of Monte Sereno and state documents: Policy for Alterations, Additions and New Construction (rev. 1/2023), Projects Requiring a Site Development Permit (rev. 1/2026), Story Pole and Netting Requirements (rev. 11/2024), Hours of Construction flyer (rev. 1/2024), Building Permit Submittal Requirements (rev. 9/2025), General Plan (adopted August 2026). Checked November 2026.
Our process
How your remodel gets built
Walk-through
Nathan walks every room with you and maps the full remodel before a single wall comes down.
Design
Our in-house design team draws one set of 3D plans for every trade. The City’s 50% rule and the hearing thresholds are checked on those plans.
Permit
We file with the City online and answer plan check. If the project needs a Site Development Permit, that comes first.
Build
One Mayer’s crew carries the project start to finish. 6 to 12 weeks from permit approval to final walkthrough, depending on scope. Any change is put in writing first.
No pitch. Just an honest estimate.
Leave your number — we call back in minutes, not days.
Rated 5.0 on Google & Houzz. 57 reviews: Google 25, Houzz 32.
Questions
Monte Sereno home remodel questions
When does a remodel become new construction in Monte Sereno?
When less than 50% of the existing exterior walls or less than 50% of the existing roof area remains. The City’s policy then treats the project as new construction, which has to meet the rules for new buildings: fire sprinklers, fire access, Title 24 energy compliance, green building standards and the local reach codes.
Will a major remodel trigger fire sprinklers?
Crossing the City’s 50% line does: a project that keeps less than half of the existing exterior walls or roof area is treated as new construction, and the rules for new construction include fire sprinklers. The Building Department makes the final determination. The City also sends building plans to the Santa Clara County Fire Prevention Division, which reviews them against the fire code.
How big an addition can I build without a Site Development Permit?
Under 500 square feet in the R-1-8 zone and under 750 square feet in the R-1-20 and R-1-44 zones, as long as it is not a new second story and does not raise the roof by more than 24 inches. Adding to an existing second story has lower limits: 250 square feet in R-1-8 and 500 in the other two zones. At or above those sizes, the Site and Architectural Commission decides at a public hearing. Other reviews, such as removing a significant tree, can still go to the Commission.
Do I have to put up story poles?
The City’s handout requires them for a second-story addition, for an addition over 500 square feet and for a new structure over 500 square feet. The poles and orange netting show the roofline, a California registered land surveyor certifies them two weeks before the public hearing, and they stay up for 10 days after the Commission’s decision. For an addition over 500 square feet that needs no hearing, we confirm with the Planning Department.
What hours can construction happen in Monte Sereno?
Monday to Friday from 8 am to 8 pm and Saturday from 9 am to 5 pm. No construction is allowed on Sundays or on 13 holidays the City lists, which include Juneteenth, Columbus Day, the day after Thanksgiving and Christmas Eve. A holiday that falls on a Saturday is observed on Friday, and one that falls on a Sunday is observed on Monday.
Do I need a soils report for an addition?
For some. The City requires a geotechnical report for all new structures, for additions to homes that have pier and grade beam foundations, and for any hillside conditions.
How long does a whole-home remodel take?
6 to 12 weeks from permit approval to final walkthrough, depending on scope. City review comes first, and a Site and Architectural Commission hearing comes before that when the project needs a Site Development Permit.
Which Monte Sereno neighborhoods do you work in?
All eight that the City’s General Plan names: Bicknell, Daves, Foothill, Hillside, La Rinconada, Loma Serena, Rose/Andrews and Twin Creeks. The plan describes Bicknell as “large, ranch style homes that have been built on expansive and flat converted farmland” and the homes of Loma Serena as “dating back to 1964”.
Who does home remodeling in Monte Sereno?
Mayer’s Construction & Remodeling is a licensed contractor (CA License #1063024), family-owned since 2009 and rated 5.0 on Google and Houzz across 57 reviews. We design, permit and build whole-home remodels and additions in Monte Sereno with our own crew. The first visit is free.
Where we work
Across Monte Sereno, and next door
The City’s General Plan names eight neighborhoods. We remodel homes in all eight.
More in Monte Sereno
Home remodeling nearby
